Warning: mkdir(): No space left on device in /www/wwwroot/NEW7.COM/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/bjdfdg.com/cache/e5/92a54/a02b2.html): failed to open stream: No such file or directory in /www/wwwroot/NEW7.COM/func.php on line 115
Shanxi 8×500kW_Gas power generation project_Case_Jinan Jichai Huanneng Gas Power Generation Equipme



  1. 泡芙短视频污,泡芙视频下载地址,泡芙旧版安装包,泡芙短视频官网入口

    Welcome to济南济柴泡芙短视频污燃气发电设备有限公司official website!

    Contact information

    Tel:
    +86-531-88012499
    Mob:
    +86-18668968402
    +86-18678860619
    Fax:
    +86-531-69958299
    Email:
    greenpowercn@126.com
    Address:
    Building 8, Shuntai Square, Shunhua Road,High-tech Zone, Jinan City, PRC

    Gas power generation project

    Shanxi 8×500kW

    Create a project and build a monument

    Case Introduction
    • The internal combustion engine used in the high-concentration gas power generation process, although
    • 总体情况介绍:

      山西8

      The internal combustion engine used in the high-concentration gas power generation process, although its manufacturers are different, some of the structure will be different, but in general, its basic structure is the same, are composed of gas intake exhaust, ignition, cooling, lubrication, control several systems. The gas intake and exhaust system contains gas, filter, intake and exhaust valve, etc. After the gas and air are fused through the filter, they enter the combustion engine cylinder block, and the heat energy is converted into kinetic energy and the movement of the piston and connecting rod is promoted, and the power is output. The cooling system uses the cylinder liner and the cold water pump to circulate the coolant between the cooling water tank and the gas turbine to achieve the purpose of cooling. The ignition system uses the ignition transformer and spark plug to ignite the mixed gas. The lubrication system uses the oil pump to lubricate the lubricating oil. The control system uses the metering valve and throttle valve to reasonably adjust the amount of gas entering, so that the proportion of gas in the mixed gas is about 7% and the gas is burned in the gas cylinder block.


    Jinan Jichai Huanneng Gas Power Generation Equipment Co., Ltd
    • 服务热线

      0531-62325028
      0531-69951266

    Shanxi 8×500kW

    Do a project, build a monument

    The internal combustion engine used in the high-concentration gas power generation process, although

    山西8

    The internal combustion engine used in the high-concentration gas power generation process, although its manufacturers are different, some of the structure will be different, but in general, its basic structure is the same, are composed of gas intake exhaust, ignition, cooling, lubrication, control several systems. The gas intake and exhaust system contains gas, filter, intake and exhaust valve, etc. After the gas and air are fused through the filter, they enter the combustion engine cylinder block, and the heat energy is converted into kinetic energy and the movement of the piston and connecting rod is promoted, and the power is output. The cooling system uses the cylinder liner and the cold water pump to circulate the coolant between the cooling water tank and the gas turbine to achieve the purpose of cooling. The ignition system uses the ignition transformer and spark plug to ignite the mixed gas. The lubrication system uses the oil pump to lubricate the lubricating oil. The control system uses the metering valve and throttle valve to reasonably adjust the amount of gas entering, so that the proportion of gas in the mixed gas is about 7% and the gas is burned in the gas cylinder block.


    Previous:
    网站地图